Respondemos no mesmo dia útil

CPC(D)Y-70 vs CPC(D)Y-100

Two sizes of the same frame. The difference that decides the order is usually aisle width or the weight of a full pallet — not the number on the plate.

CPC(D)Y-70CPC(D)Y-100
ModelCPC(D)Y-70CPC(D)Y-100
Rated capacity7 t10 t
capacity3.5 t3.5 t
standard
powerDiesel, four-wheel driveDiesel, four-wheel drive

Rows that differ are marked. Rows without a mark are identical on both builds.

Choose CPC(D)Y-70 when

7.0 t. Bought for precast concrete and steel frame erection, where the load is heavy and the ground is never finished.

The building is the constraint: floor loading, door width, or a mezzanine that will not take the heavier chassis. CPC(D)Y-70 is also the cheaper unit, so a fleet that never loads to the plate should not pay for the frame it does not use.

CPC(D)Y-70 specification

Choose CPC(D)Y-100 when

10.0 t. The largest site truck in the range. Transport is the constraint: check the low-bed requirement before ordering.

The load is the constraint: pallets that arrive over-weight, attachments that shift the centre of gravity forward, or a mast tall enough that residual capacity falls away at height. Buying one size up is cheaper than a second handling step.

CPC(D)Y-100 specification

Se não sabe qual

Send the aisle width, the load and the lift height. We answer with the model and the reason, not both brochures.