CPC(D)Y-50 vs CPC(D)Y-70
Two sizes of the same frame. The difference that decides the order is usually aisle width or the weight of a full pallet — not the number on the plate.
| CPC(D)Y-50 | CPC(D)Y-70 | |
|---|---|---|
| Model | CPC(D)Y-50 | CPC(D)Y-70 |
| Rated capacity | 5 t | 7 t |
| capacity | 3.5 t | 3.5 t |
| standard | ||
| power | Diesel, four-wheel drive | Diesel, four-wheel drive |
Rows that differ are marked. Rows without a mark are identical on both builds.
Choose CPC(D)Y-50 when
5.0 t four-wheel drive. For heavier site loads and for yards that flood: the ground clearance is the reason, not the capacity.
The building is the constraint: floor loading, door width, or a mezzanine that will not take the heavier chassis. CPC(D)Y-50 is also the cheaper unit, so a fleet that never loads to the plate should not pay for the frame it does not use.
CPC(D)Y-50 specificationChoose CPC(D)Y-70 when
7.0 t. Bought for precast concrete and steel frame erection, where the load is heavy and the ground is never finished.
The load is the constraint: pallets that arrive over-weight, attachments that shift the centre of gravity forward, or a mast tall enough that residual capacity falls away at height. Buying one size up is cheaper than a second handling step.
CPC(D)Y-70 specificationSe non sa quale
Send the aisle width, the load and the lift height. We answer with the model and the reason, not both brochures.